Glade Ferry Ramp Replacement

Permanent sheet pile wall around ferry landings

Installation of new ferry ramps on both sides of the Kootenay River, using steel sheetpile bulkhead walls. The work involved replacement of existing ferry ramps on both sides of the Kootenay River, removal of the existing concrete ramp structure, supply and installation of steel sheetpile bulkhead walls, all the fabricated steelwork, precast concrete slabs, new reinforced concrete, and the supply and installation of granular fills and asphalt pavement.

About this Project

Permanent sheet pile wall around ferry landings
Type: Pile Driving & Foundations
Location: Glade BC near Castlegar
Principal Client: Ministry of Transportation and Infrastructure