Resource Bridge

Flathead River Bridge Installation

Location at 65 km on the Flathead River FSR in the Rocky Mountain Resource District.  Installation of a 30 metre temporary bridge supplied by the Ministry.  Installation of a 36.57 metre steel girder bridge with composite concrete deck on driven steel H pile.  On the completion of the installation of the permanent bridge and all approaches, need to de-activate the temporary bridge.  Also included placement of Rip Rap and HSS railings.

About this Project

Flathead River Bridge Installation
Type: New Bridge Construction, Pile Driving & Foundations
Location: Flathead Valley
Value: $300,000
Principal Client: Ministry of Lands, Forests, and Natural Resources