Resource Bridge
Grey Creek bridge
The constructed bridge keeps the Grey Creek Pass road open for travellers. Completed in the fall of 2017 during a bad fire season in the East Kootenays.
This project consists of the installation of one 18.264 m o/o steel girder superstructure with 4.9 m wide concrete deck on steel post and precast concrete foundation. Services included the removal of the existing 12.2 m steel w/ timber deck on log crib Structure, with relocation to Cranbrook. Construction survey, no post barriers, rip rap and road approaches were part of this project.
About this Project
Grey Creek bridge
Type: | New Bridge Construction |
---|---|
Location: | Grey Creek Pass near Kimberley BC |
Value: | $100,000 |
Principal Client: | Ministry of Forests Lands and Natural Resources |