=

River’s Edge Ranch – Yahk, BC

River's Edge Ranch

Installed a temporary bridge over the Moyie River, which was removed at the end of the project.  Demolition of the existing failing bridge, including removal of the abutments and instream pier. And construction of a new permanent bridge, which included driving piles on the banks and instream, and installing sheet piles for the abutments.  Bridge is 36 m long.

About this Project

River's Edge Ranch
Type: New Bridge Construction
Location: Yahk, BC
Have a project like this one?