Pipe Pile Installation

Installing pipe piles at Shelter Bay BC, during low water.  After installation the piles were filled with concrete and completed by placing bird caps on top.  100% NDT testing was utilized on this project. At low water table the crane was able to work from dry land installing pipe piles, instead of having to use a barge.  Since it was winter work all the piles had to be hoarded after the concret was installed so the concrete cured at the optimum temperature.

About this Project

Pipe Pile Installation
Type: Pile Driving & Foundations
Location: south of Revelstoke BC
Value: $250,000
Principal Client: BC Hydro