Installed a temporary bridge over the Moyie River, which was removed at the end of the project. Demolition of the existing failing bridge, including removal of the abutments and instream pier. [...]
Installation of a private bridge on acreage with access only from one side. By launching the bridge across the stream, installation was possible without touching the water. Bridge was L100 [...]
Installed a large diameter multiplate culvert in the Flathead area of BC. Utilized a sheet pile coffer dam to divert the creek enabling construction in the dry. Moved approximately 9,000 cubic [...]
Remove and Replace Existing Bridge located at Surprise Lake, BC. Located 20 km East of Atlin, BC, the Surprise Lake Bridge spans Pine Creek at the outflow from Surprise Lake. The existing 4-span [...]
The work involved removing and replacing six bridges: two timber deck steel girder bridges, three composite bridges and one concrete box girder bridge including associated approach work and river [...]
The work involved both the supply & installation of three bridges on the Fort Smith Highway in the NWT. The project involved the supply and installation of three new bridges on the Fort [...]
This included the supply and installation of pipe pile foundations, concrete abutments, 18m Arch, an MSE wall, placement of road grade and paving, and finally demolition of old structure and site [...]
The project scope was to remove and replace an existing Forest Service bridge that had a failing substructure. The old bridge and the foundations were removed and a new substructure and creek [...]
Remove and replace wooden resource bridge with a pipe pile foundation and concrete panel bridge. Removal of a creosote encrusted wooden bridge structure that had reached its life span. Design [...]
A loaded truck struck, and severely damaged, a bridge on Highway 93/95 near Fairmont BC and so a detour bridge was needed immediately. On a Monday in early December, 2007 a loaded truck struck [...]