The work involved the installation of the structural steel for the Wentzel Bridge. We did the girder erection and bridge launch for the Wentzel Highway Bridge in Northern Alberta. The structural [...]
The structural steel for a new bridge over the South Saskatchewan River was being shipped to the construction site a few months in advance of when the girder erection work was scheduled to take [...]
This work involved removing a suspension pipeline bridge that crossed the Columbia River in Castlegar BC. The project involved the removal of an obsolete pipeline which was over 1000’ long and [...]
The work involved the installation of the steel girders for the Alberta Highway’s Tawatinaw River Bridge. The project involved the installation of all the structural steel for the Tawatinaw [...]
Sheet pile coffer dam structure to permit the construction of a selenium treatment project. Project required sheet piling to be installed in challenging native and waste rock soils. Work was [...]
Turn of Nut is a recoqnized installation method for structural bolts. It gives the installation a proven method to acheive requirements of bridge installation without torque wrenches and [...]
Johnston undertook the exacting work of removal and disposal of this 750 foot span of a natural gas pipeline at Shoreacres BC. One of the requirements was to mitigate the pipe shedding lead [...]