Resource Roads & Bridges

Johnston Construction has been serving forestry mineral companies with resource road construction for over 25 years.

Johnston Construction has been serving the BC Ministry of Forests, forestry companies and mineral exploration companies with resource road construction, bridge installation and removal, and reclamation services for over 25 years. The size of projects undertaken have ranged from simple culvert installations to large washed-out road reconstruction and armouring projects. Our acquired work is the result of the public tendering process along with directly negotiated contracts.

Johnston Construction offers experience and expertise in:

  • New road construction in difficult terrain
  • Major road and bridge repairs following storm events, etc.
  • Roadway side-slope armouring along waterways
  • Culvert replacements and installations
  • Side-slope stabilization
  • Installation of erosion controls
  • Full roadway reclamation
  • And More..

Services

  • Johnston Construction has been providing quotations to RTL for several bridge and pilling projects in the NWT since 2009. In 2010, Johnston Construction subcontracted to RTL for the construction of 3 bridges on NWT Hwy 5. Their scope f work included driving piles for the bridge abutments, installing pile caps, bin walls, precast concrete decking and bridge rails. Their work was carried out in a very professional manner, on schedule and to specifications. RTLS would recommend Johnston Construction for pilling and bridge work and RTL would have no hesitation using them on future projects.

    Larry Fairbairn, Project Manager RTL Robinson Enterprises Ltd.
  • Johnston Construction was subcontracted for a girder delivery project located south of Prince Albert Saskatchewan in September 2013. The project required Johnston Construction to work with WSP Canada Inc. to develop a method of unloading and securely storing girders for a bridge over the South Saskatchewan River. The scope of this project included working with WSP on details to adequately brace and secure the girders for long term storage, direct site preparation to store the girders, develop a lifting procedure and performing the work to unload and store the girders on site. This project was very difficult, due to the size of the girders which were 3.2 m tall and varied in length from 37.4 m to 48.6 m. Adding to the difficulty of the project was the limited area on site to store the girders and setup the cranes required to perform the work. The most challenging aspect was the uncertain delivery schedule of the girders due to weather and road conditions which caused delays in the deliveries. Johnston Construction excelled at overcoming all of the challenges and worked to minimize costs to the client and delays. Given the high quality of the work performed under less than ideal conditions WSP would recommend Johnston Construction for future bridge construction work.

    Larry Fairbairn Project Manager RTL Robinson Enterprises Ltd.

Want to Work Together?

Have a project that we might be a good fit for? Please Request a Quote: