Detour bridge

temporary bridge install

60 foot two lane highway bridge, installed temporarily for use during the busy summer traffic flow on highway 3. Installed a detour and a 60 foot two lane temporary highway bridge.  This bridge was in service for a number of months and then we removed it when the original bridge was back in service.  This project called for some specialty attachments between the bridge railing and the concrete barriers.

About this Project

temporary bridge install
Type: New Bridge Construction
Location: Just outside Cranbrook BC
Value: $200,000
Principal Client: North Gate Pacific Contracting Ltd