Railway Bridge
Sheet pile shoring
Installed a H-pile foundation, and installed and removed sheet pile retaining walls for the bridge contractor.
Johnston Construction installed sheet pile retaining walls and H-pile foundations for a new rail bridge on CP Rail’s track near Windermere, BC for the General Contractor. The piles were installed quickly and efficiently by maximizing the productivity during work windows. Despite a large increase in the expected pile required for the project the work was completed on schedule allowing the General Contractor to move onto the next phase of work in a timely manner.
About this Project
Sheet pile shoring
Type: | Pile Driving & Foundations |
---|---|
Principal Client: | Formula Contractors BC Ltd. |